Colorado Bison Processing Facility Expands Wastewater Capacity

PROJECTS: Commercial / Industrial SERVICES: Construction;  Start up / Operations TECHNOLOGY: Activated Sludge  LOCATION: Brush, CO DESCRIPTION:  Integrated Water Services, Inc. (www.integratedwaterservices.com) recently completed the construction of the expanded activated sludge wastewater treatment system at the Brush Meat Processors, LLC (BM Processors) located in Brush, CO (100  miles northeast of Denver). BM Processors is a privately-owned enterprise that operates a bison […]

Design Build of Tesuque Casino Features MBR Treatment for Water Re-use

PROJECTS: Tribal Projects; Casinos; Resorts/Retreats SERVICES: Design-Build; Start up / Operations; Value Engineering TECHNOLOGY: MBR/Membrane Filter; Lift Station SUSTAINABLE: Landscape/Subsurface Irrigation LOCATION: Tesuque, New Mexico DESCRIPTION: Integrated Water Services, Inc. (IWS) has completed work on its $4.7 million Design-Build contract with the Tesuque Pueblo to design, permit, and construct a wastewater treatment system to produce […]

Community Upgrades WWTP For Phosphorous Treatment To Meet Colorado Regulation 85

Community Upgrades WWTP For Phosphorous Treatment To Meet Colorado Regulation 85

PROJECTS: Municipal / Districts SERVICES: Construction;  Start up / Operations TECHNOLOGY: Clarifier; Phosphorous   LOCATION: Fountain, CO DESCRIPTION: The Harold D. Thompson Regional Water Reclamation Facility, located in Fountain, CO (10 miles south of Colorado Springs) has completed its $4.5mm phosphorous treatment system upgrade to meet its new effluent limits that became effective on July 1, 2018. Colorado Regulation […]

Winslow Arizona Upgrades 2.2 MGD Wastewater Plant

PROJECTS: Municipal / Districts SERVICES: Construction;  Start up / Operations TECHNOLOGY: Lift Stations; Oxidation Ditches; Clarifier; Pond  SUSTAINABLE/WATER REUSE: Title 22 Reuse / Reclaimed Water   LOCATION: Winslow, AZ  DESCRIPTION: The City of Winslow, AZ recently upgraded its 2.2 MGD wastewater plant which will increase the efficiency of its operations, replace its clarifiers and headworks, upgrade its oxidation ditch, and upgrade […]

Malibu Starts Up New $24mm MBR Plant for Title 22 Re-use

PROJECT TYPE: Municipal / Districts SERVICE: Construction, Start-up / Operations TECHNOLOGY: Lift Station, MBR / Membrane SUSTAINABLE / WATER REUSE: Title 22 Re-use, Landscape / Subsurface Irrigation LOCATION: Malibu, CA DESCRIPTION: Integrated Water Services, Inc. (IWS) was a key team member on a $24 million recycled wastewater plant to service commercial businesses in the Civic Center area of Malibu, CA. The MBR […]