Integrated Water Services

Archives

Community Upgrades WWTP For Phosphorous Treatment To Meet Colorado Regulation 85


PROJECTS: Municipal / Districts SERVICES: Construction;  Start up / Operations TECHNOLOGY: Clarifier; Phosphorous   LOCATION: Fountain, CO DESCRIPTION: The Harold D. Thompson Regional Water Reclamation Facility, located in Fountain, CO (10 miles south of Colorado Springs) has completed its $4.5mm phosphorous treatment system upgrade to meet its new effluent limits that became effective on July 1, 2018. Colorado Regulation […]


PROJECTS: Municipal / Districts SERVICES: Construction;  Start up / Operations TECHNOLOGY: Lift Stations; Oxidation Ditches; Clarifier; Pond  SUSTAINABLE/WATER REUSE: Title 22 Reuse / Reclaimed Water   LOCATION: Winslow, AZ  DESCRIPTION: The City of Winslow, AZ recently upgraded its 2.2 MGD wastewater plant which will increase the efficiency of its operations, replace its clarifiers and headworks, upgrade its oxidation ditch, and upgrade […]


Winslow Arizona Upgrades 2.2 MGD Wastewater Plant


Malibu Starts Up New $24mm MBR Plant for Title 22 Re-use


PROJECT TYPE: Municipal / Districts SERVICE: Construction, Start-up / Operations TECHNOLOGY: Lift Station, MBR / Membrane SUSTAINABLE / WATER REUSE: Title 22 Re-use, Landscape / Subsurface Irrigation LOCATION: Malibu, CA DESCRIPTION: Integrated Water Services, Inc. (IWS) was a key team member on a $24 million recycled wastewater plant to service commercial businesses in the Civic Center area of Malibu, CA. The MBR […]



Bay Area City Takes Initiative To Control Water Destiny


PROJECTS: Potable Water, Municipal/Districts SERVICES: Construction, Start-up /Operations TECHNOLOGY: Manganese Treatment “IWS was able to work in a very small and confined area to execute the project without interfering or disturbing the residents.” LOCATION: City of East Palo Alto, CA DESCRIPTION: Construction on the Gloria Way Well upgrade in the City of East Palo Alto, CA (“the City”) has been completed and will produce […]


Texas Hill Country Design-Build MBR System