Integrated Water Services
Search
Company
Denitrification
Services
Projects
News/Library
Contact Us
|
Baldy Mesa Water District
Mechanical systems for 6,000 GPM arsenic removal treatment system including: 8 Pre-Filter Strainers; Steel pipe manifold assembly; 3 independent Train assemblies; 48 Treatment Vessels; and 3- 700 gallon reactor tanks.
Feather River Hospital
40,000 GPD system including: 220,000 gallons of tankage; 10,000 linear feet of new pressure dose leach lines; 3,000 linear feet of new sanitary sewer force mains; 21 Advantex AX-100 pods; slip line of 4,500 linear feet of existing leach lines.
Grand Canyon West Airport
FAA Partnership with the Hualapai Nation
Sandoz Pharmaceuticals
Industrial pre-treatment system upgrade: a new reagent room in the existing building including two containment pods for acid and caustic supply tanks, pumps and controls, and a new HVAC system; 8'X 17' concrete lift station, concrete pre-treatment vault.
University of New Mexico Hospital
Dangerous Bacteria in UNM Hospital Water System is Eliminated
Yolo County Housing Authority Migrant Center
Installation of 2 new 50 hp deep well turbine pumps, control system, well head improvements, disinfection equipment, 2 5,000 gallon hydro pneumatic tanks, well discharge piping, access road construction, and tie in connections to the distribution grid.
Projects
Commercial/Industrial
Baldy Mesa Water District
Sandoz Pharmaceuticals
Yolo County Housing Authority Migrant Center
Feather River Hospital
University of New Mexico Hospital
Grand Canyon West Airport
Residential Development
Resorts/Rest Areas
Schools/Camps
Shopping Centers