Integrated Water Services
Search
Company
Denitrification
Services
Projects
News/Library
Contact Us
|
Cane Creek Motor Coach Resort
IWS' first job in South Carolina! 7,500 GPD wastewater treatment system with 3 Orenco AX-100 Advantex pods, 10,000 gallown recirculation tank, 5,000 gallon wet well and a retention pond.
Echo Mountain Ski Area
Wastewater collection, treatment, and dispersal system at 10,000 ft included: 2 Orenco AX-100 Pods, a primary, recirculation and dosing tank, and a combination pressure dosed/gravity flow distribution to a subsurface infiltrator drainfield.
Esalen Institute
IWS and Worrel Team Up to Design-Build First Living Machine in California
Fort Gordon Recreation Area
Recreational retreat for soldiers and their families from nearby Fort Gordon
Glenwood Canyon Rest Areas
Plumbing and wastewater renovation included 24 Orenco AX-20 Advantex Pods, 30,000 gallons of tankage, 2 UV treatment systems, replacement of composting toilets with standard plumbing fixtures, and renovation of fresh water supply and treatment system.
Rancho Encantado Resort
Design-Build 15,000 GPD peak flow wastewater system with 6 Orenco, Advantex pods, 12,000 sq ft of geoflow subsurface water reuse drip irrigation and IWS Uplow Filter for Denitrification. Only 6 months from notice to proceed to constructruction completion
Zuma Beach Restrooms and Concession Stand
IWS Makes Memorial Day Possible for Zuma Beach in Malibu, CA
Projects
Commercial/Industrial
Residential Development
Resorts/Rest Areas
Glenwood Canyon Rest Areas
Echo Mountain Ski Area
Rancho Encantado Resort
Cane Creek Motor Coach Resort
Esalen Institute
Zuma Beach Restrooms and Concession Stand
Fort Gordon Recreation Area
Schools/Camps
Shopping Centers