Baldy Mesa Water District
Mechanical systems for 6,000 GPM arsenic removal treatment system including: 8 Pre-Filter Strainers; Steel pipe manifold assembly; 3 independent Train assemblies; 48 Treatment Vessels; and 3- 700 gallon reactor tanks.
Camp Redcloud
Western Colorado's premier Christian Camp and Retreat Center
Cane Creek Motor Coach Resort
IWS' first job in South Carolina! 7,500 GPD wastewater treatment system with 3 Orenco AX-100 Advantex pods, 10,000 gallown recirculation tank, 5,000 gallon wet well and a retention pond.
Echo Mountain Ski Area
Wastewater collection, treatment, and dispersal system at 10,000 ft included: 2 Orenco AX-100 Pods, a primary, recirculation and dosing tank, and a combination pressure dosed/gravity flow distribution to a subsurface infiltrator drainfield.
Esalen Institute
IWS and Worrel Team Up to Design-Build First Living Machine in California
Feather River Hospital
40,000 GPD system including: 220,000 gallons of tankage; 10,000 linear feet of new pressure dose leach lines; 3,000 linear feet of new sanitary sewer force mains; 21 Advantex AX-100 pods; slip line of 4,500 linear feet of existing leach lines.
Fort Gordon Recreation Area
Recreational retreat for soldiers and their families from nearby Fort Gordon
Glenwood Canyon Rest Areas
Plumbing and wastewater renovation included 24 Orenco AX-20 Advantex Pods, 30,000 gallons of tankage, 2 UV treatment systems, replacement of composting toilets with standard plumbing fixtures, and renovation of fresh water supply and treatment system.
Grand Canyon West Airport
FAA Partnership with the Hualapai Nation
Katherine Heights Subdivision
Design-Build Sustainable Project for Low Income Residential Development
La Pradera Housing Development
Design-Build 30,000 GPD peak flow wastewater system with 12 Orenco, Advantex pods, and 1 - 75 GPD lift station was built following environmental conservation, planning and engineering. Only 6 months from notice to proceed to constructruction completion!
Los Angeles Unified School District
Wastewater renovation which involved: the installation of an advanced treatment system; replacement of over 1,000 ft of existing collection lines; 7new STEP systems (1,000 to 11,000 gallon tanks); and 10,000 sq ft drip dispersal system.
Malibu Creek Plaza
Largest onsite wastewater project in Malibu, CA: 14 Orenco Advantex AX-100 pods; 117,000 gallons of precast tanks; 50,000 linear ft of control and power wire; and 10,000 ft2 of drain field under parking lot.
Mesa Vista Consolidated Schools
Upgrades to water and wastewater systems including: 10,000 GPD recirculating sand filter, 60,000 gallon cast in place concrete tank and lid, subsurface irrigation for athletic field, 34,000 gallon water storage tank, and new water treatement supply system
Paradise Plaza Mall
Renovation of Aging Wastewater Collection, Treatment, and Dispersal Infrastructure included: 20,000 GPD Sequence Batch Reactor (SBR) wastewater treatment system, grinder pumps, 2 lift stations, series of tanks and over 20,00 lineal feet of pipe.
Ramona Unified School District
First commercial Orenco Advantex System in California was installed at Hanson Elementary in Ramona, CA. Treatment system included: 2 AX-100 Advantex pods, 30,000 gallons of tankage, 19,000 sq ft of Geoflow drain field and a telemetry control system.
Rancho Encantado Resort
Design-Build 15,000 GPD peak flow wastewater system with 6 Orenco, Advantex pods, 12,000 sq ft of geoflow subsurface water reuse drip irrigation and IWS Uplow Filter for Denitrification. Only 6 months from notice to proceed to constructruction completion
Sandoz Pharmaceuticals
Industrial pre-treatment system upgrade: a new reagent room in the existing building including two containment pods for acid and caustic supply tanks, pumps and controls, and a new HVAC system; 8'X 17' concrete lift station, concrete pre-treatment vault.
Sundown Sanitary Sewer District
Design Build - Wastewater Treatment
University of New Mexico Hospital
Dangerous Bacteria in UNM Hospital Water System is Eliminated
Vista de Sangres Residential Development
IWS Design-Build 10,000 GPD wastewater system with 4 Orenco, Advantex pods, 4.8 acres of geoflow subsurface water reuse drip irrigation and IWS Uplow Filter for Denitrification.
Yolo County Housing Authority Migrant Center
Installation of 2 new 50 hp deep well turbine pumps, control system, well head improvements, disinfection equipment, 2 5,000 gallon hydro pneumatic tanks, well discharge piping, access road construction, and tie in connections to the distribution grid.
Zuma Beach Restrooms and Concession Stand
IWS Makes Memorial Day Possible for Zuma Beach in Malibu, CA