IWS began construction of the first phase of an AdvanTex wastewater treatment plant for Camp Redcloud in April, 2007. Camp Redcloud is a non-profit church camp located at an elevation of 9,500 feet and operates year-around. The wastewater system consists of an AdvanTex treatment system with UV disinfection and discharge to the Lake Fork of the Gunnison River.
Highlights:
- Phase I - six AX-100 Treatment Units
- Phase II – three AX-100 Treatment Units
- One 30,000 gallon Recirc Tank
- Two 20,000 gallon Septic Tanks
