IWS Saves Tyler Voss Middle School $150K Through Value Engineering

turn-key wastewater treatment

Integrated Water Services was awarded the Tyler Voss Middle School WWTP in Boerne, Texas for the turn-key construction of the facility’s wastewater treatment plant. IWS installed an MBR (Membrane Bioreactor) treatment system with UV disinfection, an irrigation pump station and lift station in order to service the middle school’s facility. IWS value engineered the Tyler Voss Middle School facility that saved $150,000 through electrical re-design and treatment plant and process modification.