Home » IWS Saves Tyler Voss Middle School $150K Through Value Engineering

IWS Saves Tyler Voss Middle School $150K Through Value Engineering

January 1, 2019 Case Studies
turn-key wastewater treatment

Integrated Water Services was awarded the Tyler Voss Middle School WWTP in Boerne, Texas for the turn-key construction of the facility’s wastewater treatment plant. IWS installed an MBR (Membrane Bioreactor) treatment system with UV disinfection, an irrigation pump station and lift station in order to service the middle school’s facility. IWS value engineered the Tyler Voss Middle School facility that saved $150,000 through electrical re-design and treatment plant and process modification.

 

Sign up for the Integrated Water Services newsletter. 

We share important perspectives and news on MBR wastewater treatment every two weeks.

    Please see our Privacy Policy regarding how we will handle this information.

    Thank you!
    MBR vs. CAS: Why MBR Is the Smarter Long-Term Investment
    Discover why Membrane Bioreactor (MBR) systems outperform conventional activated sludge (CAS) in long-term ROI and sludge disposal costs.
    Whitepaper:
    MBR vs. CAS: Why MBR Is the Smarter Long-Term Investment
    Discover why Membrane Bioreactor (MBR) systems outperform conventional activated sludge (CAS) in long-term ROI and sludge disposal costs.
    Whitepaper:
    MBR vs. CAS: Why MBR Is the Smarter Long-Term Investment
    Discover why Membrane Bioreactor (MBR) systems outperform conventional activated sludge (CAS) in long-term ROI and sludge disposal costs.
    Whitepaper:
    MBR vs. CAS: Why MBR Is the Smarter Long-Term Investment
    Discover why Membrane Bioreactor (MBR) systems outperform conventional activated sludge (CAS) in long-term ROI and sludge disposal costs.
    Whitepaper: