Developer Overcomes Wastewater Hurdles in Texas with Innovative MBR System

In Texas, a developer overcame sewer access challenges and strict water quality regulations by installing a decentralized membrane bioreactor (MBR) system. This approach treated sewage to high standards, allowing for development without municipal plant access. Integrated Water Services expedited the process with modular MBR systems, demonstrating a scalable and efficient solution for residential wastewater treatment […]

IWS Fast Tracks 1.5 MGD CMAR Water Treatment Facility in Firestone, CO

The St. Vrain Water Treatment Facility CMAR project is a new 1.5 MGD green field water plant for the Town of Firestone, Colorado located about 4 miles southeast of the Longmont office. The plant’s Two-Phase plant design is engineered to accommodate additional water resources as need arises with growth throughout the area. The WTP will […]

California Community Achieves Title 22 Water Re-use Milestone with MBR

The community of Monte Verdi Estates in Clovis, CA has upgraded it’s existing SBR wastewater treatment system to an MBR treatment system to meet its Title 22 Re-Use discharge limits, thereby allowing the use of the recycled water to irrigate the greenbelt areas throughout its subdivision versus using potable water for irrigation. This 125 home […]

Colorado Bison Processing Facility Expands Wastewater Capacity

PROJECTS: Commercial / Industrial SERVICES: Construction;  Start up / Operations TECHNOLOGY: Activated Sludge LOCATION: Brush, CO DESCRIPTION:  Integrated Water Services, Inc.(www.integratedwaterservices.com) recently completed the construction of the expanded activated sludge wastewater treatment system at the Brush Meat Processors, LLC (BM Processors) located in Brush, CO (100 miles northeast of Denver). BM Processors is a privately-owned enterprise that operates a bison […]

Design Build of Tesuque Casino Features MBR Treatment for Water Re-use

PROJECTS: Tribal Projects; Casinos; Resorts/RetreatsSERVICES: Design-Build; Start up / Operations; Value EngineeringTECHNOLOGY: MBR/Membrane Filter; Lift StationSUSTAINABLE: Landscape/Subsurface Irrigation LOCATION: Tesuque, New MexicoDESCRIPTION: Integrated Water Services, Inc. (IWS) has completed work on its $4.7 million Design-Build contract with the Tesuque Pueblo to design, permit, and construct a wastewater treatment system to produce disinfected tertiary water to […]

Community Upgrades WWTP For Phosphorous Treatment To Meet Colorado Regulation 85

The Harold D. Thompson Regional Water Reclamation Facility, located in Fountain, CO (10 miles south of Colorado Springs) has completed its $4.5mm phosphorous treatment system upgrade to meet its new effluent limits that became effective on July 1, 2018. Colorado Regulation 85 modified the phosphorous and inorganic nitrogen limits in 2012 to reduce nutrient pollution […]

IWS Saves Tyler Voss Middle School $150K Through Value Engineering

Integrated Water Services was awarded the Tyler Voss Middle School WWTP in Boerne, Texas for the turn-key construction of the facility’s wastewater treatment plant. IWS installed an MBR (Membrane Bioreactor) treatment system with UV disinfection, an irrigation pump station and lift station in order to service the middle school’s facility. IWS value engineered the Tyler […]

CA Winery Re-uses 80 Million Gallons of Process Water To Irrigate Crops

A California winery has recently completed the upgrade of its process wastewater treatment system to allow for the land application of up to 80 million gallons of treated effluent on over 150 acres of crops.   The treatment system includes mechanical screening, aeration, and 750,000 gallons of lined sump storage capacity.   The new process water treatment […]

Malibu Starts Up New $24mm MBR Plant for Title 22 Re-use

Integrated Water Services, Inc. (IWS) was a key team member on a $24 million recycled wastewater plant to service commercial businesses in the Civic Center area of Malibu, CA. The MBR treatment plant is designed for flows up to 188k GPD (with expansion to 376k GPD) that will meet Title 22 requirements for Disinfected Tertiary Recycled Water. […]