HIGHLIGHTS
Installed a state-of-the-art 75,000 GPD package MBR system capable of producing high-quality effluent.
IWS expertly managed the civil installation of a massive duplex influent lift station for reliable conveyance.
Featuring a 600 KW standby generator and large storage capacity, guaranteeing continuous operation.
ADVANCED WASTEWATER TREATMENT FACILITY IMPLEMENTATION
The successful completion of the Tule River Indian Tribe’s Wastewater Treatment Facility provided the Tribe with a state-of-the-art 75,000 GPD Membrane Bioreactor (MBR) system and all associated infrastructure, constructed to strict specifications developed in conjunction with US Indian Health Services. This turnkey project successfully overcame complex challenges, including the installation of a 28-foot-deep influent lift station and integrating a 600 KW standby generator, ensuring reliable, compliant, and self-sufficient wastewater management for the community.
CHALLENGES FACED
SOLUTIONS IMPLEMENTED
OUTCOME AND IMPACT
The Tule River Indian Tribe Wastewater Treatment Facility project successfully implemented a complex, pre-designed, high-capacity MBR system and all associated infrastructure. By expertly managing the installation of the critical, deep influent lift station, integrating all electrical and control systems, and delivering a complete site build-out, the project provided the Tribe with a robust, modern, and reliable solution for long-term wastewater management and environmental compliance.
For more information, please click here to Contact Our Experts.
Share this success story with your colleagues. Use the button below to download and print a PDF version of the case study.
We share important perspectives and news on wastewater treatment every two weeks.