First of its kind dual Membrane Bio Reactors (MBR) installed below grade on California Coast

June 27, 2015 Blog Case Studies Membrane Bioreactor
IWS_dualMembraneBioReactors_installedbelowgrade_California

PROJECT TYPE: Commercial Retail, Restaurants
SERVICE: Construction
TECHNOLOGY: MBR / Membrane Filtration
LOCATION: Malibu, CA
DESCRIPTION: IWS was contracted to complete the construction and Installation of two (2) independent wastewater treatment plants and related equipment for a private development company that was constructing two high end restaurants along Pacific Coast Highway in Malibu, CA.

The two treatments systems are dedicated to servicing this $20 million commercial development complex, which features two world class restaurants. IWS worked with the project engineer and the development team to assist in the layout of the treatment system to address constructability issues. The project was unique in that all the treatment system components are located below grade due to the limited real estate available for the building and parking. Due to the location in sandy soil and proximity to the Pacific Ocean and tidal influences on groundwater, the underground work required extensive dewatering and shoring systems.

During the dewatering phase, IWS pumped and treated over 2 million gallons of groundwater and discharged it directly into the ocean after obtaining the appropriate NPDES discharge permits.

The scope of work included furnishing and installation of
• Two 25,000 GPD Membrane Bio Reactors (MBR)
• Installation of multiple 20,000 to 30,000 gallon fiberglass tanks
• Installation of UV disinfection Systems
• Mechanical and Civil Construction
• System Controls and Electrical in addition to System Integration with facility operations
• System testing, start-up and operation and Maintenance during initial operational period
• Site restoration

For more information, please click here to Contact Our Experts.

pdf-icon
download IWS First of its kind dual Membrane Bio Reactors (MBR) installed below grade on California Coast pdf (612kb)

 

Sign up for the Integrated Water Services newsletter. 

We share important perspectives and news on MBR wastewater treatment every two weeks.

    Please see our Privacy Policy regarding how we will handle this information.
    Thank you!