Design Build of Tesuque Casino Features MBR Treatment for Water Re-use

PROJECTS: Tribal Projects; Casinos; Resorts/Retreats SERVICES: Design-Build; Start up / Operations; Value Engineering TECHNOLOGY: MBR/Membrane Filter; Lift Station SUSTAINABLE: Landscape/Subsurface Irrigation LOCATION: Tesuque, New Mexico DESCRIPTION: Integrated Water Services, Inc. (IWS) has completed work on its $4.7 million Design-Build contract with the Tesuque Pueblo to design, permit, and construct a wastewater treatment system to produce […]

Malibu Starts Up New $24mm MBR Plant for Title 22 Re-use

PROJECT TYPE: Municipal / Districts SERVICE: Construction, Start-up / Operations TECHNOLOGY: Lift Station, MBR / Membrane SUSTAINABLE / WATER REUSE: Title 22 Re-use, Landscape / Subsurface Irrigation LOCATION: Malibu, CA DESCRIPTION: Integrated Water Services, Inc. (IWS) was a key team member on a $24 million recycled wastewater plant to service commercial businesses in the Civic Center area of Malibu, CA. The MBR […]

Texas Hill Country Design-Build MBR System

PROJECTS: Residential Development SERVICES: Construction, Design/Build, Eng/Permitting, Start-up / Operations TECHNOLOGY: MBR/Membrane Filtration SUSTAINABLE: Sprayfield IWS was critical in guiding the project through the permitting process and delivering a solution for our wastewater needs that will protect the Edwards Aquifer and the surrounding community.   LOCATION: near San Antonio, Texas DESCRIPTION: Integrated Water Services, Inc. (IWS) has completed the first phase of […]

Rural District Upgrades To MBR Treatment

PROJECTS: Municipal/Districts SERVICES: Construction, Start-up / Operations, Value Engineering TECHNOLOGY: MBR/Membrane Filtration “IWS did a great job from the value engineering phase of the project through construction and start-up. We view IWS as a team partner and not just simply a contractor.”   LOCATION: Dumont, CO DESCRIPTION: Integrated Water Services, Inc. (IWS) has completed the construction of the Clear Creek […]

Rural Colorado Town Completes $7.1 mm Water Treatment Plant Expansion

PROJECT TYPE: Municipal / Districts, Potable Water SERVICE: Construction, Start-up / Operations TECHNOLOGY: MBR/Membrane Filter TECHNOLOGY PARTNERS: veoliawatertech.com, www.feiengineers.com LOCATION: Bayfield, Colorado DESCRIPTION: Integrated Water Services, Inc. (IWS) has completed the construction and start-up of the $7.1mm Bayfield Water Treatment Plant Expansion project located in southwest Colorado. Bayfield is a rural town and partnered with the local La Plata Archuleta Water District to […]

IWS Completes $6MM Industrial Process Wastewater Treatment Plant

PROJECTS: Commercial / Industrial SERVICES: Construction, Start-up Operations TECHNOLOGY: Ion Exchange, MBR IWS worked well under our accelerated schedule in constructing a complex treatment system to the satisfaction of all parties. LOCATION: Rocky Mountain region DESCRIPTION: IWS recently completed a Wastewater Pretreatment Plant in the Rocky Mountain region for a large industrial client to treat process and domestic wastewater from […]

Texas Permitting Overview

LOCATION: Texas PROJECT TYPE: Residential Developments SERVICE: Engineering/Permitting TECHNOLOGY: Activated Sludge, MBR/Membrane Filter, Textile Filter SUSTAINABLE / WATER REUSE: Landscape / Subsurface Irrigation DESCRIPTION: A Leader in Texas Hill Country TCEQ Permitting Integrated Water Services, Inc. (IWS) specializes in the permitting, design-build, and construction of onsite water and wastewater treatment systems throughout the US. Historically IWS projects have been located in communities that either don’t have […]

IWS Completes Design-Build of Texas Wastewater Treatment Plant

LOCATION: Kendall County, Texas PROJECT TYPE: Municipal / Districts, Residential Developments, SERVICE: Construction, Design-Build, Engineering/Permitting, Start-up / Operations TECHNOLOGY: Activated Sludge, MBR/Membrane SUSTAINABLE / WATER REUSE: Landscape / Subsurface Irrigation IWS really made this a smooth project, from working with the site civil engineer and completing the design, to constructing the system, and then doing the start-up. This was a complex project and […]

Using technology, district finds new source of water to combat California drought

PROJECT TYPE: Municipal / Districts, Potable Water SERVICE: Construction TECHNOLOGY: Membrane filtration, Reverse Osmosis SUSTAINABLE / WATER RE-USE: Re-injection to Groundwater Basin LOCATION: Santee, CA DESCRIPTION:  IWS was selected through competitive bid by the Padre Dam Water District to construct the Advanced Water Purification Demonstration project. A $1.6 Million pilot plant was constructed to treat approximately 100,000 GPD of secondary treated wastewater, and is […]

First of its kind dual Membrane Bio Reactors (MBR) installed below grade on California Coast

PROJECT TYPE: Commercial Retail, Restaurants SERVICE: Construction TECHNOLOGY: MBR / Membrane Filtration LOCATION: Malibu, CA DESCRIPTION: IWS was contracted to complete the construction and Installation of two (2) independent wastewater treatment plants and related equipment for a private development company that was constructing two high end restaurants along Pacific Coast Highway in Malibu, CA. The two treatments systems are dedicated […]