First of its kind dual Membrane Bio Reactors (MBR) installed below grade on California Coast

PROJECT TYPE: Commercial Retail, Restaurants
SERVICE: Construction
TECHNOLOGY: MBR / Membrane Filtration

IWS_dualMembraneBioReactors_installedbelowgrade_California

Tank with slip rail shoring
IWS_dualMembraneBioReactors_installedbelowgrade_California

Installing vault in shored area
IWS_dualMembraneBioReactors_installedbelowgrade_California

Installing engineered fill for leachfield
IWS_dualMembraneBioReactors_installedbelowgrade_California

Completing leachfield
IWS_dualMembraneBioReactors_installedbelowgrade_California

Pouring concrete tank cover pad
IWS_dualMembraneBioReactors_installedbelowgrade_California

Installing control panel in vault
IWS_dualMembraneBioReactors_installedbelowgrade_California

MBR Vault

LOCATION: Malibu, CA
DESCRIPTION: IWS was contracted to complete the construction and Installation of two (2) independent wastewater treatment plants and related equipment for a private development company that was constructing two high end restaurants along Pacific Coast Highway in Malibu, CA.

The two treatments systems are dedicated to servicing this $20 million commercial development complex, which features two world class restaurants. IWS worked with the project engineer and the development team to assist in the layout of the treatment system to address constructability issues. The project was unique in that all the treatment system components are located below grade due to the limited real estate available for the building and parking. Due to the location in sandy soil and proximity to the Pacific Ocean and tidal influences on groundwater, the underground work required extensive dewatering and shoring systems.During the dewatering phase, IWS pumped and treated over 2 million gallons of groundwater and discharged it directly into the ocean after obtaining the appropriate NPDES discharge permits.

The scope of work included furnishing and installation of
• Two 25,000 GPD Membrane Bio Reactors (MBR)
• Installation of multiple 20,000 to 30,000 gallon fiberglass tanks
• Installation of UV disinfection Systems
• Mechanical and Civil Construction
• System Controls and Electrical in addition to System Integration with facility operations
• System testing, start-up and operation and Maintenance during initial operational period
• Site restoration

For more information, please click the ‘Contact’ tab to reach out to us.

IWS_dualMembraneBioReactors_installedbelowgrade_California

First of its kind dual Membrane Bio Reactors (MBR) installed below grade on California Coast

Download PDF