By combining the rapid commissioning of modular design with the 50-plus-year durability of ACI-350 compliant concrete construction, NXT|MBR provides a municipal-grade foundation that integrates seamlessly into long-term master plans for municipalities, developers and utility owners. The system removes the typical friction of multi-party design and the complexities of traditional site-built projects, delivering a solution that commissions faster and adapts more efficiently than traditional alternatives.
Environmentally Responsible Water Reuse
The McKinney Roughs Nature Park, situated in a rapidly developing region just outside Austin, Texas, faced a critical challenge; its existing 0.25 MGD wastewater treatment plant (WWTP) was insufficient to meet the demands of planned residential growth and a new school. Corix Utilities (Nexus Water), the plant’s owner and operator, needed to significantly expand capacity to 0.75 MGD while adhering to stringent effluent limits due to direct discharge into the Lower Colorado River, a vital source of drinking water and aquifer replenishment.
Webinar: The “Plug-and-Play” Permanent Wastewater Plant