HIGHLIGHTS
Integrated Water Services (IWS) executed a comprehensive Design-Build project to modernize the wastewater infrastructure for Rancho Encantado, a legendary resort known for hosting global icons like the Dalai Lama and Princess Grace. As part of a $35 million resort-wide renovation, IWS engineered and constructed a system capable of treating 20,000 gallons per day, ensuring the resort meets stringent environmental standards while maintaining its reputation as a peaceful, world-class retreat.
CHALLENGES FACED
SOLUTIONS IMPLEMENTED
OUTCOME AND IMPACT
The Rancho Encantado project serves as a premier case study in how the Design-Build model can reconcile high-stakes luxury hospitality needs with complex environmental engineering. By leveraging in-house expertise and innovative filtration technology, IWS delivered a “world-class” wastewater system for a “world-class” client. The project stands as a testament to technical efficiency, proving that even the most stringent nitrogen limits can be met on an accelerated timeline without compromising the serenity or operational capacity of a legendary destination.
For more information, contact our experts.
We share important perspectives and news on wastewater treatment every two weeks.
Webinar: The “Plug-and-Play” Permanent Wastewater Plant