Death Valley Resort Secures Sustainable Wastewater Future

PROJECTS: Resorts/Retreats; Camps/Campgrounds; Park/Ranch SERVICES: Construction; Start-up / Operations TECHNOLOGY: Textile Filters SUSTAINABILITY: Landscape/Subsurface Irrigation “The project site is located in an isolated area so it is important that the contractor is well organized and has good visibility for schedule and manpower. IWS did an excellent job and worked cooperatively with the project team. They replaced the existing treatment […]

Constructed wetlands are saving Silicon Valley water

PROJECT TYPE: Parks / Recreation / Ranches SERVICE: Construction TECHNOLOGY: Constructed Wetlands SUSTAINABLE / WATER RE-USE: Sustainable Media / Natural Treatment LOCATION: Santa Clara, CA DESCRIPTION: Integrated Water Services, Inc. (IWS) was selected by the City of Santa Clara, CA to construct an advanced multi-phase bio-filtration system to revitalize one of its showcase park’s features, its Central Park Pond. With the new IWS […]

WA State Parks Lower Discharge Levels and Achieve Sustainability

PROJECT TYPE: Parks/Recreation/Ranches; Camps/Campgrounds SERVICE: Construction; Start-up/Operations TECHNOLOGY: Denitrification SUSTAINABLE/WATER RE-USE: Sustainable Media/Natural Treatment LOCATION: Mount Vernon, WA DESCRIPTION: The treatment system upgrade included installing Two VBT 300 Aerators in a new 20,000 Gallon Xerxes Fiberglass Tank to help reduce the biologic loading prior to AdvanTex AX100 Treatment. The AdvanTex Treatment System included four, AX100’s for Secondary Treatment and Nitrification. ENR Technologies, LLC […]

IWS Makes Memorial Day Possible for Zuma Beach in Malibu, CA

PROJECT TYPE: Parks/Recreation/Ranches SERVICE: Construction; Start-up / Operations TECHNOLOGY: Textile Filter LOCATION:  Malibu, CA DESCRIPTION: IWS was awarded a construction contract under the direction of Los Angeles County to install an onsite wastewater treatment system at the Zuma Beach complex in Malibu, CA to be completed before the critical Memorial Day weekend kick-off to the summer beach season. IWS completed the work […]

Peaceful Valley Ranch in Colorado Installs Onsite Wastewater Treatment System

PROJECT TYPE: Parks/Recreation/Ranches SERVICE: Construction; Start-up / Operations TECHNOLOGY: Textile Filter LOCATION:  Rocky Mountain National Park, CO DESCRIPTION: In the Spring of 2011, IWS completed the construction of an Orenco AdvanTex wastewater treatment system for Peaceful Valley Ranch just South of Colorado’s famous Rocky Mountain National Park. We enjoy working with IWS and appreciate their technical and construction expertise and approach […]

Mesa Verde National Park Installs On-site Wastewater Treatment System

PROJECT TYPE: Parks/Recreation/Ranches SERVICE: Construction; Start-up /Operations TECHNOLOGY: Textile Filter Sustainable/Water Re-use: Infiltration Basin; Leed / Award Projects LOCATION: Mesa Verde National Park, CO DESCRIPTION: The system design included the following components: a) two, 20,000 gallon primary treatment tanks; b) a 20,000 dosing tank; c) a 14,000 recirculating tank; d) 11 Advantex AX-100 pods, two of which were used for tertiary […]

Ducks Unlimited Water Project in Colorado

PROJECT TYPE: Parks/Recreation/Ranches; SERVICE: Construction; Start-up/Operations LOCATION: Weldona, CO DESCRIPTION: The recently completed water augmentation project for Ducks Unlimited (www.ducks.org) at the DT Ranch in Weldona, included the installation of a water infiltration pumping system and pipeline at the ranch on the South Platte River. The work was completed in accordance with our design and it worked out great for us PES recently […]

US Forest Service Upgrades Aging Water and Wastewater Infrastructure

PROJECT TYPE: Parks/Recreation/Ranches; Camps/Campgrounds SERVICE: Construction; Start-up/Operations TECHNOLOGY: Textile Filter LOCATION: Cape Perpetua, OR DESCRIPTION: IWS constructed and began operations on a wastewater treatment plant encompassing 5,000 feet of water lines, and upgraded a 260,000 gallon aeration basin while installing primary, recirculating, and dosing tanks We had a lot of challenges on this project but just kept chipping away and […]

Wyoming Municipality Saves Money with STEP Collection and Water Re-use

PROJECT TYPE: Parks/Recreation/Ranches  SERVICE: Construction; Start-up/Operations  TECHNOLOGY: Textile Filter  SUSTAINABLE / WATER RE-USE: Landscape/Subsurface Irrigation LOCATION:  Near Cheyenne, WY DESCRIPTION: IWS completed the construction of the largest Orenco AdvanTex wastewater treatment system in Wyoming at the Archer Complex, an 875 acre community recreational facility located just east of Cheyenne along I-80. The wastewater treatment system was part of an overall Phase I […]