New System for Sangre de Christo

PROJECT TYPE: Educational/Schools SERVICE: Construction; Start-up / Operations TECHNOLOGY: Textile Filter LOCATION:  South Central CO DESCRIPTION: The treatment system had the following components: a 30,000 gallon primary tank; a 10,000 gallon recirculation tank; a 1,500 gallon dosing tank; four AX-100 pods; a 5,600 ft2 leachfield utilizing Quick 4 Infiltration Chambers; and a Control Building. IWS has a great deal of experience with these […]

Tribal Village in New Mexico Upgrades Wastewater Treatment System

PROJECT TYPE: Residential Developments; Tribal Projects SERVICE: Construction; Start-up / Operations TECHNOLOGY: Textile Filter LOCATION:  San Ildefonso Pueblo, NM DESCRIPTION: The scope of work for the project included installing: a) two, 25,000 gallon primary tanks and one 20,000 gallon recirculation tanks; b) five AX-100 pods; c) a lift station and splitter box with flow meter; d) water line (760’); e) two fire […]

Onsite Wastewater Treatment System Installed at Primero School District, Colorado

PROJECT TYPE: Educational/Schools SERVICE: Construction; Start-up / Operations TECHNOLOGY: Textile Filter LOCATION:  Rocky Mountain National Park, CO DESCRIPTION: IWS constructed a wastewater system designed to treat 10,000 gallons per day of wastewater from the school and includes the following components: four AX-100 treatment units; two 15,000 gallon tanks and one 8,000 gallon septic tank; one 10,000 gallon recirculation tank; one 2,000 gallon […]

Peaceful Valley Ranch in Colorado Installs Onsite Wastewater Treatment System

PROJECT TYPE: Parks/Recreation/Ranches SERVICE: Construction; Start-up / Operations TECHNOLOGY: Textile Filter LOCATION:  Rocky Mountain National Park, CO DESCRIPTION: In the Spring of 2011, IWS completed the construction of an Orenco AdvanTex wastewater treatment system for Peaceful Valley Ranch just South of Colorado’s famous Rocky Mountain National Park. We enjoy working with IWS and appreciate their technical and construction expertise and approach […]

Onsite Wastewater Treatment System at Arizona Border School

PROJECT TYPE: Educational/Schools SERVICE: Construction; Start-up / Operations TECHNOLOGY: Denitrification SUSTAINABLE / WATER RE-USE: Sustainable Media / Natural Treatment LOCATION:  Hereford, AZ DESCRIPTION: The upgrade to the existing treatment system included the following: a 15,000 gallon septic tank; a 12,000 gallon recirculation tank; five Orenco AX-100 pods; infiltration chambers for dispersal; collection system; fencing; and a lift station. IWS Was able to […]

Mesa Verde National Park Installs On-site Wastewater Treatment System

PROJECT TYPE: Parks/Recreation/Ranches SERVICE: Construction; Start-up /Operations TECHNOLOGY: Textile Filter Sustainable/Water Re-use: Infiltration Basin; Leed / Award Projects LOCATION: Mesa Verde National Park, CO DESCRIPTION: The system design included the following components: a) two, 20,000 gallon primary treatment tanks; b) a 20,000 dosing tank; c) a 14,000 recirculating tank; d) 11 Advantex AX-100 pods, two of which were used for tertiary […]

Hoehne “Farmers” Select IWS for Advanced Treatment System

PROJECT TYPE: Educational/Schools SERVICE: Design/Build; Start-up /Operations TECHNOLOGY: Textile Filter LOCATION: Southeastern CO DESCRIPTION: IWS’ scope of work included the construction and installation of all the treatment components, which included dewatering for all the tank excavations. We teach our kids to recognize a job well done and we extend the same courtesy to those that do a great […]

US Forest Service Upgrades Aging Water and Wastewater Infrastructure

PROJECT TYPE: Parks/Recreation/Ranches; Camps/Campgrounds SERVICE: Construction; Start-up/Operations TECHNOLOGY: Textile Filter LOCATION: Cape Perpetua, OR DESCRIPTION: IWS constructed and began operations on a wastewater treatment plant encompassing 5,000 feet of water lines, and upgraded a 260,000 gallon aeration basin while installing primary, recirculating, and dosing tanks We had a lot of challenges on this project but just kept chipping away and […]

Wyoming Municipality Saves Money with STEP Collection and Water Re-use

PROJECT TYPE: Parks/Recreation/Ranches  SERVICE: Construction; Start-up/Operations  TECHNOLOGY: Textile Filter  SUSTAINABLE / WATER RE-USE: Landscape/Subsurface Irrigation LOCATION:  Near Cheyenne, WY DESCRIPTION: IWS completed the construction of the largest Orenco AdvanTex wastewater treatment system in Wyoming at the Archer Complex, an 875 acre community recreational facility located just east of Cheyenne along I-80. The wastewater treatment system was part of an overall Phase I […]

Onsite Water Re-use at LEED Gold Certified Arizona High School

PROJECT TYPE: Educational/Schools SERVICE: Construction; Start-up/Operations TECHNOLOGY: Textile Filter SUSTAINABLE / WATER RE-USE: LEED/Award Projects LOCATION:  Tucson, AZ DESCRIPTION: The wastewater treatment plant that IWS recently constructed on the campus of Andrada Polytechnic and Pantano High Schools located just outside Tucson, AZ (10 miles southeast) is part of a sustainable project that is on track for LEED Gold Certification and includes a 1 MW […]