Case Studies

  • IWS Fast Tracks 1.5 MGD CMAR Water Treatment Plant in Firestone, CO
    The St. Vrain Water Treatment Facility CMAR project is a new 1.5 MGD green field water plant for the Town of Firestone, Colorado located about 4 miles southeast of the Longmont office. The plant’s Two-Phase plant design is engineered to accommodate additional water resources as need arises with growth throughout the area. The WTP will include chlorine ...
  • California Community Achieves Title 22 Water Re-use Milestone with MBR
    The community of Monte Verdi Estates in Clovis, CA has upgraded it’s existing SBR wastewater treatment system to an MBR treatment system to meet its Title 22 Re-Use discharge limits, thereby allowing the use of the recycled water to irrigate the greenbelt areas throughout its subdivision versus using potable water for irrigation. This 125 ...
  • Colorado Bison Processing Facility Expands Wastewater Capacity
    PROJECTS: Commercial / Industrial SERVICES: Construction;  Start up / Operations TECHNOLOGY: Activated Sludge LOCATION: Brush, CO DESCRIPTION:  Integrated Water Services, Inc.(www.integratedwaterservices.com) recently completed the construction of the expanded activated sludge wastewater treatment system at the Brush Meat Processors, LLC (BM Processors) located in Brush, CO (100 miles northeast of Denver). BM Processors is a privately-owned enterprise that operates a bison ...
  • Design Build of Tesuque Casino Features MBR Treatment for Water Re-use
    PROJECTS: Tribal Projects; Casinos; Resorts/Retreats SERVICES: Design-Build; Start up / Operations; Value Engineering TECHNOLOGY: MBR/Membrane Filter; Lift Station SUSTAINABLE: Landscape/Subsurface Irrigation LOCATION: Tesuque, New Mexico DESCRIPTION: Integrated Water Services, Inc. (IWS) has completed work on its $4.7 million Design-Build contract with the Tesuque Pueblo to design, permit, and construct a wastewater treatment system to produce disinfected tertiary water to meet ...
  • Community Upgrades WWTP For Phosphorous Treatment To Meet Colorado Regulation 85
    The Harold D. Thompson Regional Water Reclamation Facility, located in Fountain, CO (10 miles south of Colorado Springs) has completed its $4.5mm phosphorous treatment system upgrade to meet its new effluent limits that became effective on July 1, 2018. Colorado Regulation 85 modified the phosphorous and inorganic nitrogen limits in 2012 to reduce nutrient pollution in ...
How helpful was this post?
-